Boomtec turbine engineering equipment

Engineering Platforms

Choose the recovery route around the actual process.

Beyond the three core product families, Boomtec evaluates larger ORC arrangements, difficult steam conditions and process-gas expansion routes against each plant's operating boundary.

Complementary Routes

Three engineering platforms for conditions that need more than a standard package.

These platforms describe technical routes and review priorities. Equipment scope, output and performance boundary remain project-specific.

ORC Platform

Split-Type Axial ORC

A separate axial-flow ORC configuration for larger heat-source flows, including geothermal water, process heat and hot-water applications.

Explore ORC systems ->

Steam Platform

Complex Steam Recovery

Industrial Saturated-Steam Turbines for flash, wet, negative-pressure, ash-bearing and corrosive process-steam conditions.

Explore steam turbines ->

Gas Platform

Process-Gas Expansion

Pressure-energy recovery assessment for natural gas, process gas and CO2 where medium properties, preheating and pressure control define the route.

Explore pressure recovery ->

Technical Review

Start with the conditions that determine feasibility.

For all routes, the initial review considers medium and composition, temperature, pressure basis, flow range, operating hours, cooling or preheating conditions, downstream process constraints and site interfaces.

Source Definition

Confirm the energy source, realistic operating envelope and measurement basis before selecting a recovery route.

Process Boundary

Define required outlet conditions, process control needs and interfaces with existing equipment.

Project Configuration

Evaluate turbine, generator, heat exchange, auxiliaries and controls as one project-specific system.

Discuss Your Process

Send the available operating parameters for an initial route review.

Even a preliminary range is useful if the source is still being defined.